Closet Jongkok
|
252.334
|
Buah
|
Closet Duduk
|
7.689.000
|
set
|
1 Buah Pemasangan Urinoir
|
1.853.439
|
Buah
|
1 Buah Pemasangan Wastafel
|
813.621
|
Buah
|
1 Buah Pemasangan Bak Mandi Batu Bata Volume 0.3 M3
|
1.674.276
|
Buah
|
Bak Mandi
|
450.000
|
Buah
|
1 M Pekerjaan Pasang Pipa Pvc Type Aw Dia. 10"
|
312.429
|
m
|
1 Kg Pekerjaan Pemasangan Pipa Baja
|
30.382
|
Kg
|
Pipa Pvc Dia. 5
|
185.838
|
biji
|
Pipa Pvc Dia. 1,5
|
48.909
|
biji
|
Pipa Pvc Dia. 2 1/ 2
|
104.786
|
biji
|
Pipa Pvc Dia. 4
|
234.256
|
biji
|
Pipa Pvc Dia. 1/ 2
|
17.303
|
biji
|
Pipa Pvc Dia. 5
|
323.748
|
biji
|
Pipa Pvc Dia. 2
|
138.303
|
biji
|
Pipa Pvc Dia. 6
|
544.379
|
biji
|
Pipa Pvc Dia. 5
|
388.047
|
biji
|
Pipa Pvc Dia. 3
|
271.403
|
biji
|
Pipa Pvc Dia. 6
|
824.494
|
biji
|
Pipa Pvc Dia. 10
|
1.899.942
|
biji
|
Pipa galvanised
|
25.299
|
Kg
|
1 Buah Pemasangan Kran Air 3/4" Atau 1/2"
|
49.897
|
Buah
|
1 Buah Pemasangan Bak Cuci Piring Stainless Steel Dan Accessories
|
530.679
|
Buah
|
Kran wastafel
|
200.000
|
Buah
|
Kran Tembok
|
185.000
|
Buah
|
Kran Shower
|
1.320.000
|
Buah
|
Kran Bebek
|
300.300
|
Buah
|
Kran Air Tembok
|
348.000
|
Buah
|
Kran Sink Angsa
|
155.000
|
Buah
|
Kran Air
|
16.400
|
Buah
|
Push Kran Urinal
|
358.000
|
bh
|
Stop Kran 1/ 4 Dan 1/ 2
|
24.310
|
set
|
1 Buah Pemasangan Floor Drain
|
95.337
|
Buah
|
Monday, October 31, 2016
Pekerjaan Sanitasi Gedung th 2016
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment