2. Harga satuan Pekerjaan Tahun 2016
Monday, October 31, 2016
Pemasangan Aksesoris th 2016
Gate valve dia 2
|
1.500.000
|
Buah
|
Gate valve dia 2 1/2
|
1.200.000
|
Unit
|
Gate valve dia 4
|
2.500.000
|
Buah
|
Gate Valve F/ F Ci Dia.5"
|
3.479.300
|
Buah
|
Gate Valve F/ F Ci Dia.6"
|
4.185.900
|
bh
|
Tee Ukuran 1/ 2
|
1.779
|
Buah
|
Tee Ukuran 3/ 4
|
2.457
|
Buah
|
Tee Ukuran 1"
|
4.090
|
Buah
|
Tee Ukuran 2"
|
14.508
|
Buah
|
Tee Ukuran 4
|
67.712
|
Buah
|
Pekerjaan Pemasangan PIPA th 2016
Pipa Pvc Dia. 1/ 2
|
17.303
|
btg
|
Pipa Pvc Dia. 3/ 4
|
38.236
|
btg
|
Pipa Pvc Dia. 1
|
55.418
|
btg
|
Pipa Pvc Dia. 1 1/ 4
|
74.778
|
btg
|
Pipa Pvc Dia. 1,5
|
48.909
|
Buah
|
Pipa Pvc Dia. 2
|
138.303
|
btg
|
Pipa Pvc Dia. 3
|
141.328
|
Buah
|
Pipa Pvc Dia. 4
|
234.256
|
bh
|
Pipa Pvc Dia. 5
|
185.838
|
Buah
|
Pipa Pvc Dia. 6
|
824.494
|
bh
|
Pipa Pvc Dia. 8
|
929.522
|
btg
|
Pipa Pvc Dia. 10
|
710.900
|
btg
|
Pipa Pvc Dia. 12
|
998.093
|
btg
|
Pipa HDPE Hitam Dia. 63 mm
|
108.000
|
m1
|
Pipa HDPE Hitam Dia. 90 mm
|
123.000
|
m
|
Pipa Gip 1/ 2"
|
150.060
|
meter
|
Pipa Gip 1
|
300.120
|
btg
|
Pipa Gip 1,5
|
444.030
|
meter
|
Pipa Gip Dia. 2
|
115.005
|
m
|
Pipa Gip 3
|
1.740.000
|
Buah
|
Pipa Gip 4"
|
1.800.000
|
Buah
|
Pipa Gip 6
|
3.200.000
|
Buah
|
Pipa Gip Medium
|
1.638.000
|
btg
|
Pipa incian pipa GIP
|
330.000
|
m
|
Perbaikan Pipa Gip/ Sj 3” Patok Pengaman Hidran
|
288.750
|
Buah
|
Pipa Baja Dia. 1,5
|
547.965
|
btg
|
Pipa Baja Dia. 2
|
736.032
|
btg
|
Pipa Baja Dia. 2 1/ 2
|
1.167.639
|
btg
|
Pipa Baja Dia. 3
|
1.527.537
|
btg
|
Pipa Baja Dia. 6
|
3.823.578
|
bh
|
Pipa Baja Dia. 12
|
9.205.350
|
btg
|
Pipa Baja
|
24.138
|
Kg
|
Pekerjaan Sanitasi Gedung th 2016
Closet Jongkok
|
252.334
|
Buah
|
Closet Duduk
|
7.689.000
|
set
|
1 Buah Pemasangan Urinoir
|
1.853.439
|
Buah
|
1 Buah Pemasangan Wastafel
|
813.621
|
Buah
|
1 Buah Pemasangan Bak Mandi Batu Bata Volume 0.3 M3
|
1.674.276
|
Buah
|
Bak Mandi
|
450.000
|
Buah
|
1 M Pekerjaan Pasang Pipa Pvc Type Aw Dia. 10"
|
312.429
|
m
|
1 Kg Pekerjaan Pemasangan Pipa Baja
|
30.382
|
Kg
|
Pipa Pvc Dia. 5
|
185.838
|
biji
|
Pipa Pvc Dia. 1,5
|
48.909
|
biji
|
Pipa Pvc Dia. 2 1/ 2
|
104.786
|
biji
|
Pipa Pvc Dia. 4
|
234.256
|
biji
|
Pipa Pvc Dia. 1/ 2
|
17.303
|
biji
|
Pipa Pvc Dia. 5
|
323.748
|
biji
|
Pipa Pvc Dia. 2
|
138.303
|
biji
|
Pipa Pvc Dia. 6
|
544.379
|
biji
|
Pipa Pvc Dia. 5
|
388.047
|
biji
|
Pipa Pvc Dia. 3
|
271.403
|
biji
|
Pipa Pvc Dia. 6
|
824.494
|
biji
|
Pipa Pvc Dia. 10
|
1.899.942
|
biji
|
Pipa galvanised
|
25.299
|
Kg
|
1 Buah Pemasangan Kran Air 3/4" Atau 1/2"
|
49.897
|
Buah
|
1 Buah Pemasangan Bak Cuci Piring Stainless Steel Dan Accessories
|
530.679
|
Buah
|
Kran wastafel
|
200.000
|
Buah
|
Kran Tembok
|
185.000
|
Buah
|
Kran Shower
|
1.320.000
|
Buah
|
Kran Bebek
|
300.300
|
Buah
|
Kran Air Tembok
|
348.000
|
Buah
|
Kran Sink Angsa
|
155.000
|
Buah
|
Kran Air
|
16.400
|
Buah
|
Push Kran Urinal
|
358.000
|
bh
|
Stop Kran 1/ 4 Dan 1/ 2
|
24.310
|
set
|
1 Buah Pemasangan Floor Drain
|
95.337
|
Buah
|
Pekerjaan Pengecatan th 2016
1 M2 Pekerjaan Pengecatan Interior Tembok Baru
|
25.283
|
M2
|
1 M2 Pekerjaan Pengecatan Exterior Tembok Baru
|
55.637
|
M2
|
1 M2 Pekerjaan Pengecatan Interior Tembok Lama
|
21.015
|
M2
|
1 M2 Pekerjaan Pengecatan Exterior Tembok Lama
|
42.029
|
M2
|
1 M2 Pekerjaan Pengecatan Bidang Kayu Lama
|
46.127
|
M2
|
Pekerjaan pengecatan bangunan
|
50.833
|
M2
|
1 M2 Pekerjaan Pengecatan Permukaan Baja Dengan Meni Besi
|
32.325
|
M2
|
1 M2 Pekerjaan Pengecatan Permukaan Baja Galvanis (Semprot)
|
172.170
|
M2
|
1 M2 Pekerjaan Pengecatan Plafond
|
28.954
|
M2
|
1 M2 Pekerjaan Pengecatan Kansteen
|
24.911
|
M2
|
1 M2 Pekerjaan Pengecatan Bidang Kayu Baru 3 Lapis Cat Penutup
|
80.801
|
M2
|
1 M2 Pekerjaan Pengecatan Bidang Kayu Baru 2 Lapis Cat Penutup
|
49.472
|
M2
|
1 M2 Pekerjaan Pengecatan Permukaan Plat Besi
|
164.833
|
M2
|
1 Unit Pekerjaan Pengecatan Tiang Dan Patok Pengaman
|
38.398
|
M2
|
1 M2 Pekerjaan Pengecatan Permukaan Baja Galvanis (Manual)
|
169.774
|
M2
|
1 M2 Pekerjaan Pengecatan Permukaan Pipa Baja
|
158.639
|
M2
|
1 M2 Pekerjaan Pencucian Bidang Permukaan Tembok Yang Pernah Dicat
|
16.187
|
M2
|